10My actionsNotifications

Quality

Quality plans, inspections, non-conformance reports and corrective actions.

Working on:Al-Waha Region Development Authority
Open NCRs
12⁦6⁩ critical or high

Of ⁦16⁩ raised in 2026

First-time pass
⁦36%⁩

⁦64%⁩ with remarks · of ⁦22⁩ inspections

Corrective actions overdue
1

Of ⁦4⁩ open actions

Average time to close
30 days

From raising an NCR to closing it

Cost of poor quality
SAR 7M

Rework, retests and delay — 2026

NCR lifecycle

Drag a report to its next stage. It cannot go to verification without a corrective action, nor close before its actions are done and verified.

Open3 · ⁦3⁩ cards

Found, not yet investigated

Space picks the card up, the arrow keys move it, Space drops it, Escape cancels.

Investigating4 · ⁦4⁩ cards

Root-cause analysis

⁦4⁩ of ⁦4⁩

Space picks the card up, the arrow keys move it, Space drops it, Escape cancels.

Corrective action3 · ⁦3⁩ cards

Corrective action under way

Space picks the card up, the arrow keys move it, Space drops it, Escape cancels.

Verifying2 · ⁦2⁩ cards

Checking the fix works

Space picks the card up, the arrow keys move it, Space drops it, Escape cancels.

Closed4 · ⁦4⁩ cards

Closed after verification

Space picks the card up, the arrow keys move it, Space drops it, Escape cancels.

Quality by project, and inspections

Acceptance criteria met in each project’s plan, inspection pass rate and open NCRs — and the inspection & review calendar.

Quality by project

Worst first · click the criteria to open the quality plan

ProjectCriteria metPass rateOpen NCRs

Inspections & reviews

Scheduled for the next two weeks, and the latest results

Upcoming
  • 302026-10

    Review of the handover file and documentation

    Document review · Document & Correspondence Management Platform

  • 022026-11

    Design review of the redesigned pier foundations

    Design review · Wadi Al-Rummah Bridge

  • 042026-11

    Pre-launch penetration test

    Security test · Unified Digital Services Platform

  • 082026-11

    Re-test of tank 2 water-tightness

    Site inspection · East Waha Wastewater Treatment Plant

  • 112026-11

    MEP first fix — level 3

    Site inspection · Government Offices Complex

Latest results
  • 262026-10

    Quay-wall inspection

    Site inspection · Waterfront Rehabilitation

  • 242026-10

    Base-course compaction — section 3

    Site inspection · Northern Ring Road Development — Phase 2

  • 212026-10

    Waterproofing of the east roof

    Site inspection · Government Offices Complex

  • 192026-10

    Flash test of panel batch 6

    Material test · Solar Power for Government Buildings

  • 192026-10

    Acceptance test of the wave-one services

    Acceptance test · Unified Digital Services Platform

    Passed
  • 152026-10

    Acceptance of dams 3 and 4

    Site inspection · Rainwater Harvesting & Small Dams

    Passed

Registers

Every NCR, inspection, plan, standard and corrective action — searchable, filterable, exportable.

Open
⁦12⁩ results
Export CSV
CriticalCorrective actionWorkmanshipEng. Waleed O. Al-JuhaniEng. Waleed O. Al-JuhaniDirector, Utilities & Public ServicesP-021w.aljuhani@alwaha.gov.sa2026-09-18In 13 days2026-11-1030 Jumada I 1448 AHSAR 1.8M
HighInvestigatingMaterialsEng. Waleed O. Al-JuhaniEng. Waleed O. Al-JuhaniDirector, Utilities & Public ServicesP-021w.aljuhani@alwaha.gov.sa2026-10-06In 8 days2026-11-0525 Jumada I 1448 AHSAR 640K
HighVerifyingWorkmanshipEng. Shahad M. Al-MalkiEng. Shahad M. Al-MalkiDirector, Government Buildings & FacilitiesP-022s.almalki@alwaha.gov.sa2026-08-27In 2 days2026-10-3019 Jumada I 1448 AHSAR 920K
HighInvestigatingDesignEng. Ahmed Y. AsiriEng. Ahmed Y. AsiriDirector General, Roads & BridgesP-020a.asiri@alwaha.gov.sa2026-09-12In 5 days2026-11-0222 Jumada I 1448 AHSAR 760K
HighVerifyingDataDana S. Al-SalehDana S. Al-SalehDirector, Enterprise ApplicationsP-025d.alsaleh@alwaha.gov.sa2026-09-053 days overdue2026-10-2514 Jumada I 1448 AHSAR 180K
HighOpenWorkmanshipEng. Fahad T. Al-SulamiEng. Fahad T. Al-SulamiDirector, Urban DevelopmentP-023f.alsulami@alwaha.gov.sa2026-10-27In 27 days2026-11-2414 Jumada II 1448 AHSAR 430K
MediumOpenMaterialsEng. Shahad M. Al-MalkiEng. Shahad M. Al-MalkiDirector, Government Buildings & FacilitiesP-022s.almalki@alwaha.gov.sa2026-10-22In 22 days2026-11-199 Jumada II 1448 AHSAR 210K
MediumOpenWorkmanshipEng. Ahmed Y. AsiriEng. Ahmed Y. AsiriDirector General, Roads & BridgesP-020a.asiri@alwaha.gov.sa2026-10-25In 18 days2026-11-155 Jumada II 1448 AHSAR 280K
MediumCorrective actionDocumentationEng. Waleed O. Al-JuhaniEng. Waleed O. Al-JuhaniDirector, Utilities & Public ServicesP-021w.aljuhani@alwaha.gov.sa2026-09-242 days overdue2026-10-2615 Jumada I 1448 AH—
MediumCorrective actionSoftwareEng. Sultan F. Al-GhamdiEng. Sultan F. Al-GhamdiProject Manager, Unified Digital Services PlatformP-005s.alghamdi@alwaha.gov.sa2026-10-01In 6 days2026-11-0323 Jumada I 1448 AHSAR 95K
Total · 12SAR 5.4M
⁦1⁩–⁦10⁩ of ⁦12⁩

Activity

What changed in the quality records in this session.

Latest quality changes

No changes on this screen yet.

Esc

Quick actions

Go to

Projects

↑↓to move↵to openEscto close