Methodologies

Methodology templates, lifecycles, gates and smart checklists.

Methodology templates
5

For every project type and size

Projects on the templates
36

Every project of the entity

Gates defined
17

Across every template

Checklist items
39

⁦35⁩ of them mandatory

Templates

Pick a template to design its lifecycle.

Lifecycle designer — Construction & infrastructurev6

Phases with gates between them; the checklist changes with the project type you pick.

Show the checklist for a project of type:
  1. 1Initiation4 – 6 weeks

    Deliverables

    • Project charter
    • Site study report

    Smart checklist

    • Sponsor and PM named
    • Preliminary building permit from the municipality· Construction
    • Topographic and geotechnical survey· Construction · Infrastructure
  2. 2Planning8 – 16 weeks

    Deliverables

    • 100% detailed design
    • Bill of quantities
    • Schedule & cost baseline

    Smart checklist

    • Value engineering review· Construction · Infrastructure
    • Civil-defence-approved safety plan· Construction

    ⁦1⁩ items do not apply to this type

  3. 3Procurement10 – 14 weeks

    Deliverables

    • Tender booklet on Etimad
    • Award minutes

    Smart checklist

    • Bid evaluation committee approved
    • Local-content share in the booklet
  4. 4ExecutionPer contract

    Deliverables

    • Monthly progress reports
    • Payment certificates

    Smart checklist

    • Site handed to the contractor by minutes· Construction · Infrastructure
    • Documented weekly progress meeting
  5. 5Handover4 – 8 weeks

    Deliverables

    • Preliminary acceptance certificate
    • As-built drawings

    Smart checklist

    • Civil-defence completion certificate· Construction
    • O&M manuals handed over
  6. 6Closure4 weeks

    Deliverables

    • Closure report
    • Lessons learned

    Smart checklist

    • Performance bond released after the defects year· Construction · Infrastructure
    • Lessons learned approved

Which template fits a new project?

Enter the project’s traits and the PMO suggests the template.

SAR 35M

Risk level

Suggested template

Hybrid digital delivery

Gate governance per release, agile delivery in two-week sprints.

Why

  • The value is in its range
  • The type is one of its types
  • It handles this level of risk