Board of GrievancesMunjaz10My actionsNotifications

Certificate ⁦10⁩ — August 2026

Mueen Digital Platform Release 4 — build & run

Kingdom of Saudi Arabia

Board of Grievances

General Directorate of Financial Affairs — Contracts & Procurement

Certificate no.
10
Date
⁦2026-09-10⁩
Hijri
28 Rabiʻ I 1448 AH
Reference
PAY-2026-008

Interim payment certificate no. (⁦10⁩)

For the work of August 2026

Contract number
BOG/2025/007
Etimad reference
2503600485
Contract
Mueen Digital Platform Release 4 — build & run
Contractor
Adalah Digital Platforms Co.
Contractor VAT number
310105738640003
Project
Mueen Digital Platform — Release 4
Contract period
⁦2025-05-04⁩ — ⁦2027-03-31⁩
Original contract value
48,600,000
Current contract value
51,000,000including variations of SAR 2.4M

Certificate summary (SAR)

1Total value of work completed to date33,660,000
2Less: previous certificates(31,860,000)
3Value of work in this certificate1,800,000
4Less: retention (⁦10%⁩)(180,000)
5Less: advance payment recovery (⁦10%⁩)(180,000)
6Less: delay and breach penalties0
7Total deductions(360,000)
8Net before VAT1,440,000
9Add: value added tax (15%)216,000
10Net amount payable to the contractor1,656,000

Amount in words: One million six hundred fifty-six thousand Saudi riyals only

Retention held up to this certificate: SAR 3.4M — released after final acceptance.

Work by contract item

ItemItem valuePreviousThis periodTo dateComplete
Analysis & design7,650,0007,125,000280,0007,405,000⁦97%⁩
Licences & platform10,200,0008,350,000402,0008,752,000⁦86%⁩
Build & configuration15,300,0009,510,000588,00010,098,000⁦66%⁩
Systems integration7,650,0003,771,000268,0004,039,000⁦53%⁩
Testing & acceptance5,100,0001,869,000151,0002,020,000⁦40%⁩
Training & run5,100,0001,235,000111,0001,346,000⁦26%⁩
Total51,000,00031,860,0001,800,00033,660,000⁦66%⁩

Amounts in Saudi riyals.

Signatures and approvals

Contractor’s representative

Rayan M. Al-Shehri

Al-Shehri⁦2026-09-10⁩

Supervising engineer

Joud N. Al-Ahmadi

Al-Ahmadi⁦2026-09-12⁩

Project manager

Eng. Sultan F. Al-Ghamdi

Al-Ghamdi⁦2026-09-15⁩

Finance & contracts

Khalid N. Al-Mutairi

Al-Mutairi⁦2026-09-18⁩

Authority holder

Dr. Abdullah S. Al-Qahtani

Al-Qahtani⁦2026-09-21⁩
Issued electronically through Munjaz Integration-ready for Etimad

Approval chain

Fully approved and sent for payment

  1. Certificate submitted⁦2026-09-10⁩

    Rayan M. Al-Shehri

  2. Engineer verifies quantities⁦2026-09-12⁩

    Joud N. Al-Ahmadi · QA & Testing Specialist

    Took 2 days

  3. Project manager certifies⁦2026-09-15⁩

    Eng. Sultan F. Al-Ghamdi · Project Manager, Mueen Platform — Release 4

    Took 3 days

  4. Payment order prepared⁦2026-09-18⁩

    Khalid N. Al-Mutairi · Senior Finance & Contracts SpecialistPayment request creator

    Took 3 days

  5. Final approval⁦2026-09-21⁩

    Dr. Abdullah S. Al-Qahtani · President of the Board of Grievances

    Took 3 days

You are viewing as Dr. Noura M. Al-Otaibi

Segregation of duties

The platform checks these rules on every certificate

  • The payment request’s creator does not approve itKhalid N. Al-Mutairi → Dr. Abdullah S. Al-Qahtani
  • Whoever verified quantities does not prepare the payment orderJoud N. Al-Ahmadi → Khalid N. Al-Mutairi
  • The project manager does not approve the paymentEng. Sultan F. Al-Ghamdi → Dr. Abdullah S. Al-Qahtani

Certificate history

21 September 2026

  1. Payment: Dr. Abdullah S. Al-Qahtani signed “Final approval”

    2026-09-21 13:00

18 September 2026

  1. Approval: Khalid N. Al-Mutairi signed “Payment order prepared”

    2026-09-18 13:00

15 September 2026

  1. Approval: Eng. Sultan F. Al-Ghamdi signed “Project manager certifies”

    2026-09-15 13:00

12 September 2026

  1. Approval: Joud N. Al-Ahmadi signed “Engineer verifies quantities”

    2026-09-12 13:00

10 September 2026

  1. Approval: Contractor signed “Certificate submitted”

    2026-09-10 09:00
Esc

Quick actions

Go to

Projects

↑↓to move↵to openEscto close