AI insight
Eng. Saad M. Al-Dosari has time to give
Only 45% loaded in November 2026, with skills that open seats are asking for.Reassigning Eng. Saad Al-Dosari cuts the platform’s delay by 12 days
Cloud & Integration Engineer · IT Infrastructure Department
Eng. Saad M. Al-Dosari
Cloud & Integration Engineer
Architecture, integration & cloud
Load now
Mostly free
Free a week
22 h
40 h/week
This month’s cost
SAR 18.7K
At today’s allocation
Next peak
45%
In November 2026
AI insight
Only 45% loaded in November 2026, with skills that open seats are asking for.Reassigning Eng. Saad Al-Dosari cuts the platform’s delay by 12 days
July 2026 to June 2027 — planned bars are faded, leave is shaded
Share of monthly capacity; the gold line is 100%
| Category | Projects | Outside projects | Total | Capacity |
|---|---|---|---|---|
| Jul | 30% | 0% | 30% | 100% |
| Aug | 30% | 0% | 30% | 100% |
| Sep | 30% | 0% | 30% | 100% |
| Oct | 45% | 0% | 45% | 100% |
| Nov | 45% | 0% | 45% | 100% |
| Dec | 45% | 0% | 45% | 100% |
| Jan | 37% | 0% | 37% | 100% |
| Feb | 30% | 0% | 30% | 100% |
| Mar | 20% | 0% | 20% | 100% |
| Apr | 0% | 0% | 0% | 100% |
| May | 0% | 0% | 0% | 100% |
| Jun | 0% | 0% | 0% | 100% |
Working days are Sunday to Thursday
Working days: 21 · days off: 0 · load 45%
Recorded leave
No leave recorded in this period
Levels 1 to 5, rated by the line manager
Professional certifications
The last eight weeks — billable and non-billable
Average week
40 h
40 h/week
Billable share
42%
Sent on time
7 of 7
| Category | Billable | Non-billable | Total |
|---|---|---|---|
| Week 37 | 17 h | 23 h | 40 h |
| Week 38 | 17 h | 25 h | 42 h |
| Week 39 | 17 h | 22 h | 39 h |
| Week 40 | 17 h | 24 h | 41 h |
| Week 41 | 17 h | 21 h | 38 h |
| Week 42 | 17 h | 24 h | 41 h |
| Week 43 | 17 h | 23 h | 40 h |
| Week 44 | 10 h | 14 h | 24 h |