Board of GrievancesMunjaz10My actionsNotifications

What if? — Administrative Court Premises Portfolio

The portfolio’s digital twin: try a budget cut, a change in people, cancelled projects and new initiatives, and read each decision’s impact before you take it (§5, §140).

Savings needed

SAR 0

Savings the engine found SAR 0

Expected value after the decision

SAR 1.9BSAR 1.9B

keeps ⁦100.0%⁩

Weighted risk

7878

High-risk: ⁦2⁩ → ⁦2⁩

People

9898FTE

Need ⁦98⁩ of ⁦98⁩ available

Move a control to see what the engine suggests.

The engine’s recommendation per project

Lowest merit first. Click a card to read the full reasoning.

Keep4Reduce scope0Merge0Defer0Stop0

Keep

Continues as planned

The portfolio’s digital twin

Bubble colour is the engine’s recommendation; size is the project’s remaining cost.

The portfolio’s digital twin
  • Keep
  • Reduce scope
  • Merge
  • Defer
  • Stop
Cost remaining · SAR 335.6M
The portfolio’s digital twin
CategoryRisk scoreStrategic valueCost remainingChart legend
Riyadh Administrative Court Building95.074.0SAR 335.6MKeep
Digital Administrative Court HQ, Wadi Al-Dawasir64.066.0SAR 205.8MKeep
Jeddah Administrative Courts Complex79.082.0SAR 196MKeep
Hail Administrative Court Building40.075.0SAR 77.4MKeep

From remaining spend to spend after the decision

From remaining spend to spend after the decision
  • Total
  • Increase
  • Decrease
From remaining spend to spend after the decision
CategoryChangeRunning total
Remaining spend todaySAR 860.8MSAR 860.8M
After the decisionSAR 860.8MSAR 860.8M

Saved scenarios, compared

Pick up to three scenarios to compare side by side on budget, benefits, risks and resources (§118).

  • A — 15% budget cut

    Ready-made

  • B — 10% cut with 10% fewer people

    Ready-made

  • Current scenario (not saved)

Scenario comparison

AA — 15% budget cutBB — 10% cut with 10% fewer people
Budget cut⁦15%⁩⁦10%⁩
People change0%−10%
Cancelled projects——
Added initiatives——
Savings found315.1M145.4M
ShortfallTarget metTarget met
Value after the decision1.5B⁦78.3%⁩1.8B⁦92.1%⁩
Risk after the decision8077
People needed70 / 9884 / 88
RecommendationsKeep 2Reduce scope 1Stop 1Keep 2Reduce scope 1Merge 1

Value kept vs savings

  • Value kept %
  • Savings of budget %
Esc

Quick actions

Go to

Projects

↑↓to move↵to openEscto close