Confidential
Kingdom of Saudi Arabia
Board of Grievances
Projects Follow-up Office (EPMO)
- Code
- DOC-0203
- Version
- V5
- Date
- 2026-10-19
Solution & integration design
Mueen Digital Platform — Release 4
1. Solution overview
The platform is the unified Mueen portal, a case workflow and forms engine, a central integration layer and a case and beneficiary data store, hosted on the government cloud inside the Kingdom with a 99.9% availability target.
2. Integration map
| Platform | Purpose | Pattern | Status |
|---|---|---|---|
| Nafath | Single sign-on | Synchronous — OIDC | In testing |
| Absher | Beneficiary verification | Synchronous — REST | Done |
| Government Service Bus | Notify defendant agencies and receive their replies | Asynchronous — messaging | In build |
| Administrative Execution Platform | Hand final judgments over for execution | Nightly batch | Planned |
Every interface goes through the central API gateway; the Government Service Bus uses asynchronous messaging so a slow agency never blocks a case registration, with automatic retries and an audit trail for every message.
3. Simulator & fallback
A local simulator of the Nafath, Government Service Bus and Absher interfaces is built in the first integration sprint, so the team keeps working when the national test environments go down — as they did for nine days in September.
4. Data model
- Beneficiary: national ID, capacity (litigant, lawyer or government agency), contacts, consents
- Case: type, the competent judicial circuit, stage, attachments, statutory deadlines
- Notice: Service Bus message number, defendant agency, status, reply date
- Log: every change with who, when and through which channel
5. Cybersecurity & data protection
- Compliance with the ECC-2:2024 and the cloud cybersecurity controls
- Personal data encrypted at rest and in transit under the PDPL
- An independent penetration test before launch with no critical or high findings
- Round-the-clock monitoring from the security operations centre
Enterprise architect
Architecture review
Confidential