Kingdom of Saudi Arabia
Al-Bunyan Al-Rasekh Contracting Co.
- Number:
- و/1448/0408
- Date:
- 24 Rabiʻ II 1448 AH
- Corresponding to:
- 5 October 2026
- Attachments:
- 1
Subject: Claim for a 120-day extension
The Director, Court Complexes, Board of Grievances
Greetings,
We request a 120-day extension of contract BOG/2024/011 because the HV line in zone 4 of the site has not been diverted — outside the contractor’s control — and it sits on the critical path.
With our kind regards,
Project Director, Al-Bunyan Al-Rasekh Contracting Co.
Eng. Fahad Al-Rashed
Copy to:
- Bait Al-Khebra Engineering Consultants
Critical-path delay analysis