Construction drawings — Building 5

InternalIn reviewV7

Construction drawings for Building ⁦5⁩ (the Supreme Administrative Court building): civil and structural works and utility diversions.

More
Showing version:

Internal

Kingdom of Saudi Arabia

Board of Grievances

Projects Follow-up Office (EPMO)

Code
DOC-0211
Version
V7
Date
2026-10-07

Construction drawings — Building ⁦5⁩

Board of Grievances Headquarters, Riyadh

⁦1⁩. Description

Construction drawings — Building ⁦5⁩ — issued for review and coordination with the parties concerned.

Project
Board of Grievances Headquarters, Riyadh (⁦PRJ-2026-002⁩)
Project manager
Eng. Ahmed Y. Asiri
Budget
SAR ⁦1180.0M⁩
Progress
⁦42%⁩ actual against ⁦51%⁩ planned
Forecast finish
⁦2027-09-12⁩

⁦2⁩. Revision log

Rev.DescriptionBy
⁦V7⁩Issued for reviewEng. Ibrahim A. Al-Ghamdi
⁦V6⁩Levels revisedEng. Adel S. Al-Amoudi
⁦V5⁩Issued for constructionEng. Adel S. Al-Amoudi
⁦V4⁩Utility diversions updatedEng. Adel S. Al-Amoudi

Note: this issue is valid once signed by the supervising consultant and the project manager.

Prepared by

Eng. Ibrahim A. Al-Ghamdi

Project manager

Eng. Ahmed Y. Asiri
Issued from Munjaz — valid only once approved electronically1 / 1

Internal

Esc

Quick actions

Go to

Projects

↑↓to move↵to openEscto close